Northwich Power STOR
THE CLIENT BRIEF
Northwich power part of the welsh Power Group requested JMH Directional Drilling to install several duct at three locations.
OUR SOLUTION
JMH decided to appoint Inrock as their rock drilling supplier for this project supplying 4 ¾ Mud motor tri cone drill bit and wire line guidance equipment incorporating a wire line engineer.
THE CHALLENGES
JMH were conscious about the ground conditions under the Mersey and Trent canal. The ground consisted of mudstone and made ground higher up, With a 6m easement to stay within. JMH, with the help of the Inrock engineer, we able to pilot 3 bores with 2m centres within the 6m easement this was paramount due to the presence of 2 ethylene pipelines one side and 5 cast iron pipes the other.
COMPLETE SUCCESS
JMH completed this scheme on time and on budget with a very happy customer.