BARHALE BURSTON FIRST TIME GRAVITY SEWER SCHEME
THE CLIENT BRIEF
Barhale PLC contracted JMH to install 2058 meters of gravity main and 4200 meters of pumped rising main for the first time sewer installation in the village of Burston Nr Diss.
OUR SOLUTION
JMH solution was to utilize our specialized gravity installation crew to install the gravity main to line and level to a tolerance of 0.5%.
THE CHALLENGES
During this scheme JMH were faced with several different challenges ranging from working in garden areas of private dwellings to tight confined country roads. The ground conditions varied from clayey ground to sand and gravels with large pockets of flint. With expertise the crew formed a plan, mixed the correct drilling fluid for the task and installed the pipes as per the client requirements.
COMPLETE SUCCESS
JMH completed this scheme on time and on budget with a very happy customer.